Industrial Park with Logistics plan. Area: 10 hectaries (100,000sqm) with odd cuts. The industrial park infrastructure has been completed and 1/2 of the entire area has been designed. Enterprise solution support. The remaining land use period is 47 years. Complete the lower floor Convenient for move to international shipping High speed is being completed shortening the distance from the city center Contact for more options
Industrial Park with Logistics plan. Area: 10 hectaries (100,000sqm) with odd cuts. The industrial park infrastructure has been completed and 1/2 of the entire area has been designed. Enterprise solution support. The remaining land use period is 47 years. Complete the lower floor Convenient for move to international shipping Hi...