The building currently a restaurant and hotel located at Kumasi Asafo beside the VIP bus station, closer to the road side, haves 250kva plant and a transformer, 72 rooms 37 completed, 2 big conference halls, 8 stores, a restaurant and a big bar, a roof top bar with unfinished swimming pool and also a 3 story building together. The building is 95% done And going for 2.3 million dollars