BUILDING Two-story building finished building in January 2008, with a cement construction that it has 12.58 meters (41.26 feet) in front, by 30.47 meters (99.94 feet) of background, with a total of 720 m2 (2361.60 feet) of building. Is located in front of the beach, with a front to the Paseo de los Turistas and street in the back, that is the building goes from street to street. On its back it has parking for four vehicles.
BUILDING Two-story building finished building in January 2008, with a cement construction that it has 12.58 meters (41.26 feet) in front, by 30.47 meters (99.94 feet) of background, with a total of 720 m2 (2361.60 feet) of building. Is located in front of the beach, with a front to the Paseo de los Turistas and